HISTORIC SALEM INC
  • Home
    • About HSI
    • Mission
    • Board & Staff
    • JOIN & GIVE >
      • Join or Renew Membership
      • Donate
      • Volunteer Opportunities
      • Join Our Mailing List
    • The Bowditch House >
      • Nathaniel Bowditch
    • Contact Us
  • Preservation
    • Preservation Award Recipients
    • About the Advocacy Summaries >
      • 301 Essex - Former Jerry's
      • Pioneer Village and Camp Naumkeag
      • Demolition Delay
    • Protecting Neighborhoods >
      • North Salem and Mack Park
      • Bridge Street Neck Neighborhood
      • Salem Willows Neighborhood
    • Council Candidates 2025
    • Protect Historic Resources >
      • Brick Committee
    • New Development in Historic Neighborhoods
    • Successes >
      • 2011 Update of Renewal Plan
      • 1740 Samuel Pope House
      • Beckford Way
      • Historic Salem Jail
      • Wendt House, 18 Crombie Street
    • For Historic Homeowners
    • Planning & Study Documents
    • Archives
  • Histories & Plaques
    • Overview
    • HHP Request Form
    • Refresh Your Plaque
    • House Relocation Database
    • HSI House History Database
  • TALK ABOUT DESIGN
    • Citizens Guide to the Downtown Renewal Plan >
      • Design in Historic Context Panel
    • Preservation Education
  • CHRISTMAS IN SALEM
    • Christmas in Salem
  • News & Events
    • News and Opinion
    • Video

75 North Street at the Zoning Board of Appeals

10/13/2023

0 Comments

 
Picture
The following letter was submitted to the Zoning Board of Appeals prior to their October 18, 2023 meeting.  You can find additional meeting materials, comments, and letters here: https://tinyurl.com/SalemZBA Under 2023 Meetings and 10-18-2023 Meeting
Picture
0 Comments

Crescent Lot Design - Letter to Design Review Board

6/22/2022

1 Comment

 
June 22, 2022

Mr. Paul Durand, Chair
Design Review Board
City of Salem
98 Washington Street
Salem, MA 01970


Dear Mr. Durand,

After reviewing the changes to the building design for the Crescent Lot as presented to the SRA at their June 8, 2022 meeting, Historic Salem offers the following comments. These comments are consistent with comments we have made during earlier schematic design iterations for this important project.

It is commonly agreed upon that this building’s location is a defining gateway to downtown Salem, which is rich in 19th- and early 20th- century commercial and mixed-use buildings representative of Salem’s history as a commercial center. The new proposed design fails to shoulder the responsibility for this keystone location.

In conveying the Crescent Lot, the City Council required that the building be “compatible with uses in terms of scale, use, design, and historic character,” and as stated in Section 3 – Design Standards of the Downtown Renewal Plan, “Large scale developments or buildings shall be reduced in overall impact by providing variation in building massing,” with the standards presenting specific ways this can be achieved.

We support either traditional- or contemporary-design as long as the building is complementary and referential to the details and context of downtown Salem’s historic buildings. This “new” design must be explained and critiqued as rigorously as the initial Schematic Design. It is important that the Winn design team detail what aspects of Salem’s existing downtown buildings -- the scale, massing and details -- were referenced in creation of this new design. The DRB-approved Schematic Design from last fall incorporated numerous features that served to break up the mass of the building and provided depth and texture. Likewise, the new design needs to be thoroughly developed to achieve the same goal.

In its most recent SRA presentation, the design team highlighted four elevations that are of visual importance, and we agree that these locations should have emphasis or creative design elements, but we find that in the current design those elevations do not create anything of interest. Of particular importance is the “flatiron” elevation at the Washington and Bridge Street intersection as well as the river facing elevation, which have become noticeably plain and coplanar. In these locations, physical variation of the roof line and elevation depth, as well as purposeful detailing of the materials need to be considered.

We look forward to hearing more information about the materials. As presented, the materials lack articulation and, in comparison to the previous design, do not create the same visual interest, movement or highlighting of key building elevations. Buildings in Salem provide a wide slate of material options that, when used together, delineate windows/sets of windows, entrances, floor levels, rooflines, and vertical features. These elements could and should influence the design of this project in traditional or contemporary ways.

We appreciate that the Bridge Street pedestrian realm is being incorporated into the overall design and ask the Design Review Board to focus attention on the sidewalk level to ensure that the opportunity to change the character of this roadway into a pedestrian friendly path is maximized. Future presentations should include views of the building from North Street near the Federal Street traffic light.

We agree that the plaza and stair design is an improvement, particularly with a more effective terminus of the monumental stair in the center of the block.

We request that the DRB consider including the treatment of any rooftop mechanical needs as part of the overall design composition because of the extended view of this building from North Street on entering downtown.

Thank you for considering these comments.
​
Respectfully,

Emily Udy
Preservation Manager
1 Comment

Something Has Gone Very Wrong...

7/7/2021

6 Comments

 
4 Franklin Street (the former HMA car wash) sits on a major entrance corridor to our historic downtown and inside the North River Canal Corridor (NRCC). The Planning Board is reviewing a proposal to build an ambulance depot on this site and as part of the review, the Design Review Board (DRB) provided a recommendation that didn’t meet the City’s standards as outlined in the Commercial Design Guidelines (2005) or the NRCC zoning ordinance.
 
What can you do?
​

If you believe Salem  is an important historic coastal city with a need to respect and enhance our preserved fabric, and that developers should, at a minimum, be expected to meet the existing standards, then before the next Planning Board meeting tomorrow, Thursday, July 8th, let the Planning Board know (via [email protected]) that the DRB got this one wrong, and that we look to the Planning Board as the empowered municipal authority to ensure that the NRCC and other commercial design guidelines are met at 4 Franklin Street. 
Our take
 
Both the North River Canal Corridor District and the Entrance Corridor Overlay District were implemented to preserve and enhance neighborhood character and to ensure that these areas are improved for the best interests of the city. City approval boards exist to administer community vision as established by documents voted on by the City Council. It is hugely disappointing for a member of the DRB to state that “we’ve put a lot of responsibility on the owner of this property to become the gateway to Salem” when, . from our perspective, Cataldo bought that responsibility when they purchased this entrance corridor plot that has been regulated by the NRCC and Entrance Corridor overlay for years. They should absolutely be held to the standards set for them by the guidelines without any question or allowances made.
 
The Cataldo garage proposal does not meet the spirit and intent of the NRCC in many ways (including incompatible use and lack of sidewalk activation) but in addition the DRB has now recommended the massing and materiality of a building that does not reference its surrounding historic Northfields neighborhood and rejects specifically encouraged materials for the building facade.   In fact, unlike other recent North St. arrivals like Valvoline and the Salvation Army Chapel, which did build with complementary materials, Cataldo seems determined to disregard the NRCC design guidelines to build a structure more like an industrial storage shed.  The DRB made their decision while discounting significant and very specific public comment opposing the design and materials that were proposed and requesting more attention be paid to color, architectural detailing, and shape of the roof.
What is wrong with the DRB decision?

irst and foremost, the Cataldo garage is Phase 1 of a proposed two-part development, where the second phase is a residential development along the North River.  Phase 1 will set the visual and materials precedents for Phase 2 and this low standard sets a precedent for other new construction projects in close proximity including other projects on Franklin and Commercial Streets as well as the large project in early design on Bridge Street’s “Cresent Lot.” To start wrong is to end wrong. Secondly, it is giving a pass to a multi-million-dollar Massachusetts corporation with 800 employees by not requiring them to invest in the best and most compatible building design on a prominent gateway site. Part of a gateway where hundreds of thousands of visitors to our city begin to get their sense of Salem as an historic place.  History means millions of tourist dollars to our city.   
 
Cataldo’s design needs to be much better, and it can be with some specific and careful design adjustments. The development team did not begin this process without guidance.  There are requirement in the NRCC Zoning as well as the City of Salem’s Commercial Design Guidelines which includes the following language:
 
Page 18: “In Salem’s Entrance Corridors…the unique architectural character of the district must come before corporate branding.”
 
Page 24: “New Buildings need not, nor should they, imitate the…past. It is… more interesting to match materials, proportions and scale while using modern simple materials…the use of similar compatible materials and matching cornice lines…can ensure that new structures contribute to the character of the district.”
 
Page 26: “Using materials not commonly found in the immediate surroundings will make the development stand out and appear jarring. Salem has a long tradition of wood and masonry buildings. At the same time, new materials can be incorporated into projects as secondary elements…”
 
This site is prominent and will be clearly seen and it needs to meet the longstanding guidelines of the NRCC and the basic recommendations of the City’s own Commercial Design Guidelines. Further, the community at large has clearly expressed a desire for higher quality design and materials at this important site; many individuals have expended time and effort to articulate these community values.  
 
We invite you to share your thoughts with the Planning Board at or before the June 8 meeting by sending them to [email protected] or by being prepared to speak at the meeting, which begins at 6:30pm.  If you have previously provided comment to the DRB, you may want to reference that as well. We find that a wide array of respectful citizen voices is an effective way to ask boards to reconsider and hope you will add your voice to this conversation. 
6 Comments

Design Comments: 4 Franklin Street (Former HMA site)

5/24/2021

1 Comment

 
This is the text of a letter submitted to the Planning Board in advance of their May 20, 2021 meeting and to the Design Review Board in advance of their May 26, 2021 meeting.  
 


Dear Mr. Griset and Mr. Durand,

As we have been participating in this community review of the proposed project at 4 Franklin Street, we have been pleased to see the unified opinion the Planning Board expressed regarding building placement and the receptiveness with which the applicant responded to this request.  

We have one other major concern and that is regarding the materials in this proposal.  The North River Canal Corridor Zoning Ordinance in Section 8.4.2.2 highly discourages the following materials: precast concrete, pre-fabrication aluminum or metal panels.  We ask the Boards to work with incoming neighborhood member Cataldo Ambulance to merge the desired look of their brand with the neighborhood’s established “brand” or, as it is described in the Zoning Ordinance, “historic neighborhood character.”

The materials that are encouraged in the ordinance are brick, stone or wood.  These, or similar, materials could lend a warmth and connection to place that the building, as currently proposed, lacks. The highly discouraged materials should not be allowed. 
Picture
View from corner of North and Franklin Street. Image taken from applicant submission to the Design Review Board dated May 11. 2021.
There are numerous examples in the neighborhood that the architect did not identify when presenting to the Design Review Board.  The Valvoline building and the Salvation Army Chapel (image attached), both designed prior to the NRCC district designation, underwent extensive design work so that the buildings could meet their function, which includes contributing to the public realm. The historic fire station building on North St. provides public safety and is a relevant neighborhood design precedent. Indeed, North Street has a wide mix of historic building uses and there are a variety of forms and materials that could beneficially influence the design of this building. 

Because this proposal meets so few of the stated requirements of the NRCC plan, we ask the boards to insist that the building take stronger material cues from the immediate neighborhood and from downtown Salem, the backdrop of this site.

We appreciate the work these two boards do to elevate development in Salem and we appreciate the opportunity as members of the public to have our thoughts considered. 
 
Sincerely, 
Caroline Watson-Felt,
President
1 Comment

Support for the Design Review Board

9/20/2018

2 Comments

 
​Since the initiation of the North River Canal planning process in 2000, Historic Salem, Inc. has participated in and supported the goals of the North River Canal Corridor (NRCC) Master Plan and zoning ordinance.  All the neighborhoods that abut the NRCC are historic neighborhoods which will be affected by development in the Corridor.  A key aspect of the NRCC Master Plan is the importance of neighborhood character as reflected by the customized goals for each section of the Corridor.  Another key part of the NRCC zoning ordinance is the review oversight of the Design Review Board (DRB). 
 
The DRB is a board that possesses specialized skills and experience to address urban design issues as they apply in many areas of our city.  Their value has been proven in the long tradition of work with the Salem Redevelopment Authority.  The Planning Board and City Council have also shown their recognition of the valuable role of the DRB, as evidenced by the recent change that adds DRB review to projects in the Urban Entrance Corridors.  We support the work of the Design Review Board throughout the city and find that the iterative nature of their review improves each project that they evaluate. 
 
Since the introduction of the NRCC Zoning District in 2003, as far as we know, every development approved by the Planning Board has received a positive recommendation from the DRB. With the recent approval by the Planning Board of a project (16-18-20R Franklin Street) that received a negative recommendation from the DRB there is now precedent to allow projects with a negative recommendation to move forward. 
 
This dismissal of the DRB decision undermines the clear intent of the NRCC zoning ordinance.  Historic Salem believes that any project, in any zoning district, that must seek a DRB recommendation should receive positive endorsement to qualify for final consideration by other boards.
 
Historic Salem supports action to clarify the DRB relationship with the Planning Board to insure that the intent of the NRCC Master Plan and Zoning Ordinance is honored, and to improve communication and collaboration among all city boards.
2 Comments

The Hood Ice Cream Plant

3/20/2017

1 Comment

 
Nestled behind a row of houses on Mason Street and a row of businesses on Commercial Street sits an industrial building that is, for the moment, empty.  It started life in 1917 as a Hood ice cream plant before it became an adhesive factory and most recently a metal fabrication shop.  Soon it will be rehabilitated to house 10 condos, with its grounds home to an additional 19 townhouses.  This type of project is really exciting for Historic Salem for two reasons.  The first is that this project seizes the vision of the decade old North River Canal Corridor plan, and the second is, of course, the that it reuses a historic, industrial building.  

But why does the reuse of this rather nondescript and relatively unknown old building matter?  ​
Picture

Read More
1 Comment
    DONATE & SUPPORT

    Categories

    All
    301 Essex Street
    75 North Street
    Ada Louise Huxtable
    Adaptive Reuse
    Advocacy Alerts
    Christmas In Salem
    Comment Letter
    Contextual Design
    Demolition Delay Waiver
    Design Review Board
    Enoch Fuller
    Events
    Five Broad Street
    Historic Courthouses
    Historic House Crush
    Historic House Plaque
    Historic Resource
    Historic School
    Homeowner Resource
    Leslie's Retreat
    Mayor Driscoll
    Neighborhoods
    North River Canal Corridor
    Photographs
    Podcast
    Point Neighborhood
    Position Statements
    Recommendation
    Salem Common Neighborhood
    Salem Handbook
    Salem Historical Commission
    Salem Matters
    Salem Redevelopment Authority
    Salem's History
    Shop
    Summer Party
    Support Letter
    Urban Renewal
    Windows
    Zoning Board Of Appeals

    Archives

    October 2025
    July 2025
    June 2025
    May 2025
    April 2025
    February 2024
    October 2023
    April 2023
    March 2023
    January 2023
    December 2022
    November 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    February 2022
    January 2022
    September 2021
    July 2021
    May 2021
    April 2021
    October 2020
    September 2020
    July 2020
    June 2020
    March 2020
    January 2020
    September 2019
    May 2019
    February 2019
    January 2019
    December 2018
    November 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    January 2018
    December 2017
    October 2017
    September 2017
    July 2017
    May 2017
    April 2017
    March 2017
    February 2017
    December 2016
    November 2016
    August 2016
    July 2016
    June 2016

    Follow us on Instagram!

    @HistoricSalemInc
​Historic Salem, Inc. | 9 North Street, Salem, MA 01970 | (978) 745-0799 | [email protected]
​Founded in 1944, Historic Salem Inc. is dedicated to the preservation of historic buildings and sites.
Copyright 2025 Historic Salem, Inc. - All Rights Reserved
Historic Salem, Inc., HSI, Christmas in Salem and all associated original artwork, logos and
content on this site are the proprietary property of Historic Salem, Inc. Misuse of this intellectual
property is prohibited and may violate applicable law.
  • Home
    • About HSI
    • Mission
    • Board & Staff
    • JOIN & GIVE >
      • Join or Renew Membership
      • Donate
      • Volunteer Opportunities
      • Join Our Mailing List
    • The Bowditch House >
      • Nathaniel Bowditch
    • Contact Us
  • Preservation
    • Preservation Award Recipients
    • About the Advocacy Summaries >
      • 301 Essex - Former Jerry's
      • Pioneer Village and Camp Naumkeag
      • Demolition Delay
    • Protecting Neighborhoods >
      • North Salem and Mack Park
      • Bridge Street Neck Neighborhood
      • Salem Willows Neighborhood
    • Council Candidates 2025
    • Protect Historic Resources >
      • Brick Committee
    • New Development in Historic Neighborhoods
    • Successes >
      • 2011 Update of Renewal Plan
      • 1740 Samuel Pope House
      • Beckford Way
      • Historic Salem Jail
      • Wendt House, 18 Crombie Street
    • For Historic Homeowners
    • Planning & Study Documents
    • Archives
  • Histories & Plaques
    • Overview
    • HHP Request Form
    • Refresh Your Plaque
    • House Relocation Database
    • HSI House History Database
  • TALK ABOUT DESIGN
    • Citizens Guide to the Downtown Renewal Plan >
      • Design in Historic Context Panel
    • Preservation Education
  • CHRISTMAS IN SALEM
    • Christmas in Salem
  • News & Events
    • News and Opinion
    • Video