HISTORIC SALEM INC
  • Home
    • About HSI
    • Mission
    • Board & Staff
    • JOIN & GIVE >
      • Join or Renew Membership
      • Donate
      • Volunteer Opportunities
      • Join Our Mailing List
    • The Bowditch House >
      • Nathaniel Bowditch
    • Contact Us
  • Preservation
    • Preservation Award Recipients
    • About the Advocacy Summaries >
      • 301 Essex - Former Jerry's
      • Pioneer Village and Camp Naumkeag
      • Demolition Delay
    • Protecting Neighborhoods >
      • North Salem and Mack Park
      • Bridge Street Neck Neighborhood
      • Salem Willows Neighborhood
    • Council Candidates 2025
    • Protect Historic Resources >
      • Brick Committee
    • New Development in Historic Neighborhoods
    • Successes >
      • 2011 Update of Renewal Plan
      • 1740 Samuel Pope House
      • Beckford Way
      • Historic Salem Jail
      • Wendt House, 18 Crombie Street
    • For Historic Homeowners
    • Planning & Study Documents
    • Archives
  • Histories & Plaques
    • Overview
    • HHP Request Form
    • Refresh Your Plaque
    • House Relocation Database
    • HSI House History Database
  • TALK ABOUT DESIGN
    • Citizens Guide to the Downtown Renewal Plan >
      • Design in Historic Context Panel
    • Preservation Education
  • CHRISTMAS IN SALEM
    • Christmas in Salem
  • News & Events
    • News and Opinion
    • Video

301 Essex Street (Jerry's) at the Design Review Board

1/25/2023

0 Comments

 
Picture

The following letter was submitted to the Design Review Board prior to their January 25, 2023 meeting. You can find other meeting materials and comment letters here: Design Review Board Meeting | salemma under the link "DRB Meeting Materials"
----

 
Mr. Paul Durand, Chair
Design Review Board
98 Washington Street
Salem, MA  01970 
 
Dear Mr. Durand,
 
On behalf of Historic Salem, Inc., I submit the following comments on the proposed addition to the “Jerry’s” building at 301 Essex Street. We appreciate the work of the DRB and the SRA as this project has gone back and forth between the boards. We think that this level of review is appropriate for this key building in its prominent downtown corner location, and we observe that the project’s design is progressing as this iterative process continues.
 
There are many specific design elements that we appreciate and hope to see in the final project, as well as some features that we think must be removed to fit the context more appropriately. It is important that the new floors relate visually with the existing single-story building and the adjacent buildings.
 
Essex Street Elevation
This elevation is well designed and has the potential to enhance the streetscape of Essex Street. We appreciate the difference between the treatment of the vertical elements on the 3rd (2nd visible) floor and the 4th and 5th floors; the distinction between major and minor vertical structure that is illustrated best in the perspective rendering; the strong horizontal stone course at the 3rd floor echoed by the fragmented stone course between the 4th and 5th floors; and the strong cornice line. These elements create a satisfying integration of the new floors and the existing building. We are interested to learn what materials are proposed and to find out specifics of the original storefront restoration but are otherwise satisfied with the design of this elevation and hope that these successful elements remain.
 
Summer Street Elevation
We very much appreciate the way the design of the Essex Street elevation turns the corner onto Summer Street. We also welcome the simple but elegant brick detailing around the tri-window bays in the 2nd and 4th quarter of this elevation and the way the strong vertical band at the 3rd and 4th floors relates to the Salem Inn roof eaves.
 
We do not think that the grand columns and heavy cornice centered over the garage door is needed to emphasize this vehicular entrance and would like to see that entire element removed. In its place, additional windows like those that flank this feature would bring subtle depth and interest to this façade, while responding to the regularized window patterns found on the adjacent 1834 Salem Inn.
 
We would also strongly suggest that the proposed garage door be reevaluated. As shown, it introduces a very residential style into a building dominated by more commercial motifs. Our suggestion is that the design of the door and the door opening be informed by the ground level storefront details or the subdued form of the existing opening currently on that elevation.
 
On both elevations, the specific tone of the light colors needs to be better understood.
 
Finally, we ask the Design Review Board to consider the design of the set-back penthouse and how it will be perceived as one approaches from upper Essex Street. Color, material detailing and the railing along the roof line should be considered carefully.
 
Thank you for considering our comments. We encourage all parties to continue this thorough and rigorous review.
 
Respectfully,

Emily Udy
Senior Preservation Advocacy Advisor

0 Comments

301 Essex Street - Comments to the SRA

1/11/2023

0 Comments

 
​January 11, 2023
 
Ms. Grace Napolitano, Chair
Salem Redevelopment Authority
98 Washington Street
Salem, MA  01970
 
 
Dear Ms. Napolitano
 
Historic Salem, Inc. has been following the proposed addition to 301 Essex Street (Jerry’s) since before it was submitted to the Salem Redevelopment Authority for review in July 2022.
 
As the project plans, scale and design have changed, we have remained in favor of a 3-4 story building at this location as it strengthens the downtown streetscape on Essex Street and the “edge” of downtown before Essex Street shifts to a more residential character in the McIntire District. Therefore, we are pleased to see this proposal being submitted for further consideration by the SRA and appreciate that the revised design seems responsive to many of the comments made by the SRA, DRB and the public.
 
We look forward to commenting on the specifics of the design, particularly elements of the Summer Street façade, during the Design Review Board processes, and we support the action of approving this plan for schematic design review.
 
The attention that this project is receiving, including the back and forth between review boards as the program has been refined, are appropriate for this key building and location and we believe this will result in a better final design outcome. We encourage all parties to continue a thorough and rigorous review. Thank you for considering our comments.
 
Respectfully,

Richard Lindeman
President
0 Comments

Comments on Demo Delay Waiver - Salem Historical Commission

1/4/2023

0 Comments

 
​January 4, 2023
 
Mr. Larry Spang, Chair
Salem Historical Commission
98 Washington Street
Salem, MA  01970
 
 
Dear Mr. Spang
 
Historic Salem, Inc. has been following the proposed addition to 301 Essex Street (Jerry’s) since before it was submitted to the Salem Redevelopment Authority (SRA) for review in July 2022.
 
Changes at this prominent location deserve rigorous review, a process that is
currently on-going under SRA guidelines and now continues with the Applicant’s demolition delay request waiver to the Salem Historical Commission.
 
This building is significant for its history, location and turn of the century commercial building style. Similarly, the building itself in this location is preferably preserved.  That said, we agree that a multi-floor addition to this building is in keeping with its downtown location and, once the design has been settled, has the potential to visually strengthen this key entrance to downtown.
We also understand that the addition will necessitate the demolition of the roof. 
 
In order for the appropriate review processes to run their prescribed courses, we urge the SHC to postpone the vote or find the building Significant and Preferably Preserved and deny the request to waive the demolition delay period until the DRB and SRA, the primary review bodies under the Downtown Renewal Plan, have given the project Preliminary Design Approval. At that point, the SHC can then review submitted plans and accept them as conditions that allow the waiver to be approved.
 
We also note that the application does not appear to be complete, lacking for example, existing conditions photographs and a description of the “proposed reuse, reconstruction, or replacement”.
 
For your information we are submitting our comment letters for the project scale and design sent to the SRA on 7/12/2022, 8/10/2022, 11/09/2022 and DRB 12/21/2022.
 
Thank you for your thoughtful review of this project and for considering our comments.
 
Respectfully,
 
Richard Lindeman
President
 
0 Comments
    DONATE & SUPPORT

    Categories

    All
    301 Essex Street
    75 North Street
    Ada Louise Huxtable
    Adaptive Reuse
    Advocacy Alerts
    Christmas In Salem
    Comment Letter
    Contextual Design
    Demolition Delay Waiver
    Design Review Board
    Enoch Fuller
    Events
    Five Broad Street
    Historic Courthouses
    Historic House Crush
    Historic House Plaque
    Historic Resource
    Historic School
    Homeowner Resource
    Leslie's Retreat
    Mayor Driscoll
    Neighborhoods
    North River Canal Corridor
    Photographs
    Podcast
    Point Neighborhood
    Position Statements
    Recommendation
    Salem Common Neighborhood
    Salem Handbook
    Salem Historical Commission
    Salem Matters
    Salem Redevelopment Authority
    Salem's History
    Shop
    Summer Party
    Support Letter
    Urban Renewal
    Windows
    Zoning Board Of Appeals

    Archives

    October 2025
    July 2025
    June 2025
    May 2025
    April 2025
    February 2024
    October 2023
    April 2023
    March 2023
    January 2023
    December 2022
    November 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    February 2022
    January 2022
    September 2021
    July 2021
    May 2021
    April 2021
    October 2020
    September 2020
    July 2020
    June 2020
    March 2020
    January 2020
    September 2019
    May 2019
    February 2019
    January 2019
    December 2018
    November 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    January 2018
    December 2017
    October 2017
    September 2017
    July 2017
    May 2017
    April 2017
    March 2017
    February 2017
    December 2016
    November 2016
    August 2016
    July 2016
    June 2016

    Follow us on Instagram!

    @HistoricSalemInc
​Historic Salem, Inc. | 9 North Street, Salem, MA 01970 | (978) 745-0799 | [email protected]
​Founded in 1944, Historic Salem Inc. is dedicated to the preservation of historic buildings and sites.
Copyright 2025 Historic Salem, Inc. - All Rights Reserved
Historic Salem, Inc., HSI, Christmas in Salem and all associated original artwork, logos and
content on this site are the proprietary property of Historic Salem, Inc. Misuse of this intellectual
property is prohibited and may violate applicable law.
  • Home
    • About HSI
    • Mission
    • Board & Staff
    • JOIN & GIVE >
      • Join or Renew Membership
      • Donate
      • Volunteer Opportunities
      • Join Our Mailing List
    • The Bowditch House >
      • Nathaniel Bowditch
    • Contact Us
  • Preservation
    • Preservation Award Recipients
    • About the Advocacy Summaries >
      • 301 Essex - Former Jerry's
      • Pioneer Village and Camp Naumkeag
      • Demolition Delay
    • Protecting Neighborhoods >
      • North Salem and Mack Park
      • Bridge Street Neck Neighborhood
      • Salem Willows Neighborhood
    • Council Candidates 2025
    • Protect Historic Resources >
      • Brick Committee
    • New Development in Historic Neighborhoods
    • Successes >
      • 2011 Update of Renewal Plan
      • 1740 Samuel Pope House
      • Beckford Way
      • Historic Salem Jail
      • Wendt House, 18 Crombie Street
    • For Historic Homeowners
    • Planning & Study Documents
    • Archives
  • Histories & Plaques
    • Overview
    • HHP Request Form
    • Refresh Your Plaque
    • House Relocation Database
    • HSI House History Database
  • TALK ABOUT DESIGN
    • Citizens Guide to the Downtown Renewal Plan >
      • Design in Historic Context Panel
    • Preservation Education
  • CHRISTMAS IN SALEM
    • Christmas in Salem
  • News & Events
    • News and Opinion
    • Video