March 22, 2023
Mr. Paul Durand, Chair Design Review Board 98 Washington Street Salem, MA 01970 Dear Mr. Durand, On behalf of Historic Salem, Inc., I submit the following comments on the proposed addition to the “Jerry’s” building at 301 Essex Street. We continue to believe that thorough design review is appropriate for this key building in its prominent downtown corner location. We also note that each time this project is presented the changes are significant and very different from the previous iterations and often don’t match what was discussed in the previous meetings. The most noticeable change in this design is the colors shown in the rendering. However, upon review of the Material Sheet that was submitted there is hope that the Summer Street façade will use traditional brick coloring to match that of the existing building. We strongly support the traditional brick color choice, which has been fairly consistently shown throughout the review process and we ask for confirmation that the Material Sheet description is accurate. If the entire new construction is dark gray, as illustrated, it becomes a looming hulk atop a small historic building, with no connection between the two. It is also jarring against the context of the Salem Inn, other downtown Salem buildings and the residential neighborhood across the street. There were specific parts of the January 2023 design that we appreciated, including the design of the Essex Street elevation and the way it turned the corner onto Summer Street. In this current proposal, much of the elegance of the Essex Street elevation is lost due to the simplification (removal) of the window mullions and the loss of the solid corner column. Some return to the more articulated elegance of the previous version would be appreciated as a contribution to the detail found in Salem’s downtown. Another change on Essex Street is the newly introduced dark façade materials. Due to the inconsistency between the color of the rendering and the brick description we are led to wonder if the coloring on the Essex Street façade is accurate and look forward find out more. On the Summer Street façade, we find the columns and heavy cornice that emphasize the garage opening unnecessary, as noted in our January letter. A regular pattern of windows would suit this elevation and relate well to the window pattern of the adjacent Salem Inn and the facing building on Essex Street. A more simplified Summer Street façade would showcase the Essex Street façade and provide a visual transition to the residential McIntire District. Thank you for considering our comments. We encourage all parties to continue this thorough and rigorous review. Respectfully, Emily Udy Senior Preservation Advocacy Advisor
0 Comments
The following letter was submitted to the Design Review Board prior to their January 25, 2023 meeting. You can find other meeting materials and comment letters here: Design Review Board Meeting | salemma under the link "DRB Meeting Materials"
|
301_essex_street-historical_inventory_form.pdf | |
File Size: | 4129 kb |
File Type: |
Mr. Paul Durand, Chair
Design Review Board
City of Salem
98 Washington Street
Salem, MA 01970
Dear Mr. Durand,
After reviewing the changes to the building design for the Crescent Lot as presented to the SRA at their June 8, 2022 meeting, Historic Salem offers the following comments. These comments are consistent with comments we have made during earlier schematic design iterations for this important project.
It is commonly agreed upon that this building’s location is a defining gateway to downtown Salem, which is rich in 19th- and early 20th- century commercial and mixed-use buildings representative of Salem’s history as a commercial center. The new proposed design fails to shoulder the responsibility for this keystone location.
In conveying the Crescent Lot, the City Council required that the building be “compatible with uses in terms of scale, use, design, and historic character,” and as stated in Section 3 – Design Standards of the Downtown Renewal Plan, “Large scale developments or buildings shall be reduced in overall impact by providing variation in building massing,” with the standards presenting specific ways this can be achieved.
We support either traditional- or contemporary-design as long as the building is complementary and referential to the details and context of downtown Salem’s historic buildings. This “new” design must be explained and critiqued as rigorously as the initial Schematic Design. It is important that the Winn design team detail what aspects of Salem’s existing downtown buildings -- the scale, massing and details -- were referenced in creation of this new design. The DRB-approved Schematic Design from last fall incorporated numerous features that served to break up the mass of the building and provided depth and texture. Likewise, the new design needs to be thoroughly developed to achieve the same goal.
In its most recent SRA presentation, the design team highlighted four elevations that are of visual importance, and we agree that these locations should have emphasis or creative design elements, but we find that in the current design those elevations do not create anything of interest. Of particular importance is the “flatiron” elevation at the Washington and Bridge Street intersection as well as the river facing elevation, which have become noticeably plain and coplanar. In these locations, physical variation of the roof line and elevation depth, as well as purposeful detailing of the materials need to be considered.
We look forward to hearing more information about the materials. As presented, the materials lack articulation and, in comparison to the previous design, do not create the same visual interest, movement or highlighting of key building elevations. Buildings in Salem provide a wide slate of material options that, when used together, delineate windows/sets of windows, entrances, floor levels, rooflines, and vertical features. These elements could and should influence the design of this project in traditional or contemporary ways.
We appreciate that the Bridge Street pedestrian realm is being incorporated into the overall design and ask the Design Review Board to focus attention on the sidewalk level to ensure that the opportunity to change the character of this roadway into a pedestrian friendly path is maximized. Future presentations should include views of the building from North Street near the Federal Street traffic light.
We agree that the plaza and stair design is an improvement, particularly with a more effective terminus of the monumental stair in the center of the block.
We request that the DRB consider including the treatment of any rooftop mechanical needs as part of the overall design composition because of the extended view of this building from North Street on entering downtown.
Thank you for considering these comments.
Respectfully,
Emily Udy
Preservation Manager
Categories
All
301 Essex Street
75 North Street
Ada Louise Huxtable
Adaptive Reuse
Advocacy Alerts
Christmas In Salem
Comment Letter
Contextual Design
Demolition Delay Waiver
Design Review Board
Enoch Fuller
Events
Five Broad Street
Historic Courthouses
Historic House Crush
Historic House Plaque
Historic Resource
Historic School
Homeowner Resource
Leslie's Retreat
Mayor Driscoll
Neighborhoods
North River Canal Corridor
Photographs
Podcast
Point Neighborhood
Position Statements
Recommendation
Salem Common Neighborhood
Salem Handbook
Salem Historical Commission
Salem Matters
Salem Redevelopment Authority
Salem's History
Shop
Summer Party
Support Letter
Urban Renewal
Windows
Zoning Board Of Appeals
Archives
June 2025
May 2025
April 2025
February 2024
October 2023
April 2023
March 2023
January 2023
December 2022
November 2022
September 2022
August 2022
July 2022
June 2022
May 2022
February 2022
January 2022
September 2021
July 2021
May 2021
April 2021
October 2020
September 2020
July 2020
June 2020
March 2020
January 2020
September 2019
May 2019
February 2019
January 2019
December 2018
November 2018
September 2018
August 2018
July 2018
June 2018
May 2018
April 2018
January 2018
December 2017
October 2017
September 2017
July 2017
May 2017
April 2017
March 2017
February 2017
December 2016
November 2016
August 2016
July 2016
June 2016